A DAG with contracts between steps
Every edge in the graph is a schema and freshness contract. A step that would emit a breaking change halts there, with the downstream impact listed, instead of failing in a dashboard two hops later.
Ingestion, transformation, and scheduling run as one graph on one runtime. Each edge carries a contract, each release is staged before it is live, and a backfill tells you what it will cost before you press run. That is why a pipeline built here never needs a second tool to test it, schedule it, or undo it.
Every edge in the graph is a schema and freshness contract. A step that would emit a breaking change halts there, with the downstream impact listed, instead of failing in a dashboard two hops later.
A pipeline change runs in staging against production-shaped data and is promoted when its contracts pass. Roll back to the previous release from the run history; the checkpoint is still there.
Pick a window, and the engine reports rows, partitions, and compute before the job starts. Replays are idempotent against current logic, so a catch-up never needs a hand-written script.
A representative pipeline. The contract check sits on the edge, not in a separate test suite, so a failing assertion halts publication before the warehouse, the dashboard, or the agent sees the change.
The reason teams end up with five tools is that each one stops at its own boundary. GeneFlow keeps the graph continuous from the first connector to the last dashboard — which is also why lineage, monitoring, and policy on the other proof pages are possible at all.
What engineers ask when they are deciding whether the graph can replace their scheduler.
A declared schema plus freshness, volume, and uniqueness assertions on the output of a step. The engine checks the contract before the next step reads the data. Additive changes — a new nullable column — propagate; breaking ones stop the run at that edge and open a review listing every downstream consumer.
A change is committed as a new pipeline version and runs in staging against a sample of production-shaped data. When its contracts pass, you promote it; the previous version stays addressable in run history, so rollback is a selection rather than a redeploy.
Rows and partitions in the selected window, the steps that will recompute (only changed partitions, not the full table), and the compute that implies under your plan. You see it before confirming, and the hard cap on your plan is the ceiling regardless.
Yes. Most teams run GeneFlow in parallel on one pipeline first, compare outputs against the existing job, and retire the old schedule once the contracts have been green for a few cycles. Nothing has to be cut over on day one.
The integrity proof shows how every figure downstream traces back to a committed record through these same contracts.